Reclamation & Remediation Site Intake

Bring Us a Site

This is the intake for contaminated sites: tailings impoundments, mercury-amalgam silt, creosote-soaked rail corridors and wood-treating yards, sewage solids and outfalls, pulp and paper mill canals, silted reservoirs, and open-pit spoil that needs a vegetated cover. It is the form behind Reclamation & Remediation — read that page first if you have not, because it sets out plainly what is documented and what is not.

What this form is for, and what it is not

Breakthru has a long, documented record in revegetation. Our G.E.M.® treated seed was developed on open-pit mine sites and energy company leases, and the germination trials, seeding-rate reductions and yield demonstrations behind it are published on the main page.

The separation half is different, and we would rather say so here than in a meeting. We have not published influent/effluent performance data for the Density Alteration Process on contaminated sediment, tailings or wastewater. What this form starts is a characterised bench trial on your material, with a full assay of both output streams — what came out, what stayed in, at what concentration and throughput. Nobody should commit to a full-scale installation off a brochure figure, ours included.

Answer what you have

Twenty-nine questions, and the ones you see change with the kind of site you pick. “We do not know” is a genuinely useful answer — it tells us what a characterisation programme would have to cover, and it will not stop us replying. Only eight fields are required.

If you would rather just talk to someone first, contact us here.

Please use a business or organisation email address

To cut down on automated spam, this form only accepts business or organisation email addresses. We cannot accept free email services such as Gmail, Hotmail, Outlook, Yahoo or iCloud. Please use the address at your own company, farm, cooperative, club, university or government domain. If you do not have one, call or message us directly on WhatsApp, Telegram or Signal at (+57) 313 598 0325 and we will take your information personally.

Section 1 — The Site and Who Holds It

Your business or organisation address. We send a six-digit code to it and you type the code back in on the next screen — that is how we know our reply will reach you.

Include the country code. If it takes WhatsApp, say so — for most of our clients that is the fastest route in both directions.

If your organisation has one. Nothing tells us who we are talking to faster.

Pick the closest match — the questions below adapt to your answer.

If these are different parties, say so — it changes who we need in the room.

Section 2 — The Material

Answer what you have. "We do not know" is a useful answer here and will not stop us replying — it tells us what the characterisation programme has to cover.

Cubic metres or tonnes if you have them; surface area and average depth if you do not.

Metals, cyanide, radionuclides, hydrocarbons, dioxins/furans, leachate tests, geotechnical work. Say who produced them and when.

Name the ones driving the obligation, not the full periodic table.

Density separation cannot remove dissolved nitrate. If this is part of your obligation we need to know now, because the answer is vegetation, not separation.

Minamata Convention obligations usually govern this. Recovery can change the economics of the cleanup, but only if the custody question has an answer.

Creosote is denser than water and pools on the first confining layer. If anyone has logged it, that log is the most useful document you hold.

Section 3 — The Obligation

Name the regulator and the instrument if you can. "No formal standard yet" is also an answer.

Species mix and proportions, certification class, minimum purity and germination, seeding rate, noxious-weed limits — and the authority or standard that sets them. If the specification exists as a document, name it.

Frost dates and the length of your seeding window matter more than anything else here.

Who ran the analysis, when, and what it covered — texture, organic matter, pH, salinity, nutrients and metals. Name the report and the laboratory; if no analysis exists, say so and we will scope one.

Section 4 — What You Are Asking Us For

Please read this before answering: Breakthru has not published influent/effluent performance data for D.A.P. on contaminated sediment, tailings or wastewater. What we offer at this stage is a characterised bench trial on your material, with a full assay of both output streams. Nobody should be committing to a full-scale installation off this form.

Chain of custody and who signs off on the sampling plan.

Including anything that failed. That is often the most informative answer on this form.

A range and a currency is enough. Tell us whether it is approved, requested, or indicative — and whether it covers the feasibility study only or the works as well.

The party the money actually sits with — owner, lender, government programme, reclamation bond or trust — and whether it is already committed or still to be raised.

One last check

Your information is confidential and is used only to build your program.